The PCA Document Request List: What to Ask the Owner For and What Each Document Establishes

The owner documents ASTM E2018-24 says to review, the pre-survey questionnaire, what each establishes in the report, and how to record what was not provided.

By Nicolas Reimer, Founder, Baseline PCR · Published September 18, 2026

Half of a good PCR is written from paper, not from the walkthrough. The age of the roof, the date of the last overlay, whether the fire alarm passed its annual test, whether the seller has a repair budgeted: none of that is visible on site. E2018 makes document review and interviews one of the three components of the assessment and gives a list of what to ask for. Send the list before the site visit, and send it again after.

The pre-survey questionnaire

The guide asks the consultant to send the owner's point of contact a questionnaire before the walkthrough and to interview that person during it. The questionnaire covers, in substance: ownership and management history; known deficiencies and past repairs with costs; the age of major systems; warranties; pending or planned work; preventive maintenance in place; code citations or violations; litigation related to physical condition; hazardous-materials surveys; accessibility complaints; flooding history; and tenant-owned equipment. Every answer is "reported" information in the report's vocabulary, attributed to the person who gave it.

The interview is not a formality. The point of contact will volunteer the sentence that matters ("it always puddles there after rain", "the mason said to monitor it") and the report should record it in substance and attribute it.

The documents, and what each establishes

The guide's list of documents to review when readily available, with the material information each typically carries:

DocumentWhat it establishesWhere it lands in the report
Certificate of occupancyPermitted use, construction type, occupant load, sprinkler status as of issueGeneral description; life safety
Building and fire department recordsOpen permits, violations, citationsFindings; immediate costs (code violations)
Safety inspection records (fire alarm, sprinkler, elevator, boiler)Pass or fail, dated deficiencies still openLife safety; often the source of immediate items
Warranties (roof, boilers, chillers)Installation date, coverage, exclusions, transfer termsAge basis; reserve table; key risks
Records of the age of major systemsDocumented installation datesAge basis for every reserve line
Historical repair and replacement costsWhat was done, when, for how muchCapital-work summary; owner's cost experience
Pending proposals and contractsWork already scoped or pricedFindings; cost basis
Planned improvements and capital budgetsWhat the owner intendsFindings
Outstanding code or fire citationsViolations by definition immediateImmediate costs
ADA or Fair Housing evaluationsPrior accessibility findingsAdditional considerations
Previous property condition reportsPrior deficiencies, prior reserve schedule, what was and was not done sinceEverywhere; the single most useful document
Occupancy and rent rollTenants, areas, vacancy, tenant-responsibility itemsGeneral description; Table 2 exclusions
Marketing literatureClaims about the property to checkRarely material
Drawings and specificationsAreas, quantities, systemsQuantity basis for cost lines
AppraisalArea and use, sometimes condition commentaryGeneral description

Recording what was provided and what was not

The report's document-review section carries three lists: documents reviewed, with the material information found in each; documents requested and not provided; and the substance of interviews. The second list is short to write and long in value. "As-built drawings were requested and not provided; quantities marked to be confirmed could not be checked against drawings" tells the reader exactly why some lines are engineer to provide, and it tells a later reader that the omission was the owner's, not the consultant's.

Reliance without verification

The guide allows the consultant to rely on information that appears reasonable without verifying it, and requires the report to say where each fact came from. In practice that means three words on every statement: observed, reported or documented. The certificate of occupancy says 1985, the property manager says the roof is 2011, the field observer saw the nameplate say 2004. Keep them apart in the text and the report survives cross-examination; merge them and it does not.

Sequencing that works

  1. Send the questionnaire and the document list with the engagement letter, two weeks before the visit.
  2. Read what comes back before the visit; the prior PCR and the capital history tell you where to look.
  3. Interview the point of contact on site and note who said what.
  4. Re-request the missing documents the day after the visit, in writing.
  5. Close the list in the report: provided, not provided, and the consequence.

How Baseline PCR handles documents

The engine classifies each uploaded document by type, extracts dated facts and costs with page references, and tags every fact as documented; the questionnaire link goes to the point of contact and their answers arrive as reported facts. The document-review section, the not-provided list and the interview record are drafted from that, and every statement in the narrative carries its source. The sample report shows the section built from seven documents and one questionnaire.

Sources

ASTM E2018-24 is copyrighted by ASTM International and is paraphrased here, never reproduced; buy the guide from ASTM to read the text. This page is general information for practitioners, not engineering, legal or lending advice.