Short-Term Costs
Opinions of cost for deficiencies that do not warrant immediate attention but should be undertaken on a priority basis; Table 1, below immediate.
By Nicolas Reimer, Founder, Baseline PCR · E2018-24 s3.2 and s10.3 · Published September 18, 2026
Short-term costs cover physical deficiencies that do not meet the immediate tests but should be undertaken on a priority basis. Older editions of the guide suggested a one-to-two-year window; the current text gives no number, and templates that still print "within 1 to 2 years" are quoting a superseded definition. Typical short-term items: a rooftop unit the contractor has declared uneconomic to repair, failed sealant at expansion joints, a corroded steel door, pavement base failure over a limited area.
Short-term costs appear in Table 1 below the immediate costs, with their own subtotal, and are subject to the reporting threshold. A component replaced as a short-term item is not also carried in the reserve table unless it recurs within the evaluation period.
Related: immediate costs, long-term costs, physical deficiency.
Sources
ASTM E2018-24 is copyrighted by ASTM International and is paraphrased here, never reproduced; buy the guide from ASTM to read the text. This page is general information for practitioners, not engineering, legal or lending advice.